NEW QUESTION 14
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of goods receipt for the product
  • B. Posting of production costs to the production cost collector
  • C. Archiving of documents for assembly scrap
  • D. Material staging for next order in sequence
  • E. Reduction of associated capacity requirements

Answer: A,B,E

 

NEW QUESTION 15
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 16
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:

  • A. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
  • B. Manually firm all planned orders for materials within the replenishment lead time of the material
  • C. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
  • D. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

Answer: A,D

 

NEW QUESTION 17
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Assign the alert profile to the overall profile.
  • B. Create object selection variant for product-related alerts.
  • C. Create object selection variant for resource-related alerts
  • D. Create object selection variant for transportation lane-related alerts.
  • E. Assign the overall profile to the authorization profile.

Answer: A,B,C

 

NEW QUESTION 18
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Supply Network Planning
  • B. Available-to-promise
  • C. Backorder processing
  • D. Capacity planning
  • E. Demand planning

Answer: B,C,D

 

NEW QUESTION 19
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a production order.
  • B. It is converted into a planned order.
  • C. It is converted into a reservation.
  • D. It is converted into a schedule line.

Answer: C

 

NEW QUESTION 20
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:

  • A. Multidimensional Reporting client (MDRC)
  • B. Smart Business Cockpit
  • C. HANA Live
  • D. ABAP Managed Core Data Services (CDS)

Answer: D

 

NEW QUESTION 21
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Yellow
  • C. Top of Red Base
  • D. Top of Green

Answer: D

 

NEW QUESTION 22
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:

  • A. Concur
  • B. SAP Hybris
  • C. SAP Fieldglass
  • D. SAP Human Capital Management
  • E. SAP Visual Enterprise

Answer: A,B,C

 

NEW QUESTION 23
A planner updated a production order status from partially confirmed "PCNF" to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:

  • A. The warehouse clerk still carry out goods issue transactions
  • B. The production operator cannot enter additional confirmations
  • C. The production manager can still see the capacity requirements
  • D. The buyer can still see component reservations

Answer: B

 

NEW QUESTION 24
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive planning horizon in the strategy profile.
  • B. Specify a negative planning horizon in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: C

 

NEW QUESTION 25
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The plant-specific status
  • B. The least restrictive status
  • C. The cross-plant status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 26
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:

  • A. MRP Group -> Material Master -> Plant Settings
  • B. Material Master -> MRP Group -> Plant Settings
  • C. Plant Settings -> MRP Group -> Material Master
  • D. Material Master -> Plant Settings -> MRP Group

Answer: B

 

NEW QUESTION 27
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. You require an up-to-date inventory for components
  • B. For production lines with short lead times
  • C. When goods issues can wait for final confirmation
  • D. When you need to determine the work in progress

Answer: C,D

 

NEW QUESTION 28
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Selection Method
  • B. Purchasing Info Record
  • C. Contract
  • D. Production Version

Answer: D

 

NEW QUESTION 29
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To reduce the total production lead time for along production line
  • C. To provide timely updates of inventory management for the staged components
  • D. To stage different components for a production line simultaneously

Answer: A,C

 

NEW QUESTION 30
......

All C-TS422-1909 Dumps and SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Training Courses: https://www.newpassleader.com/SAP/C-TS422-1909-exam-preparation-materials.html