[Q143-Q159] LEED Green Associate Exam Practice Tests 2026 Pass LEED-Green-Associate with confidence!

Share

LEED Green Associate Exam Practice Tests 2026 | Pass LEED-Green-Associate with confidence!

Practice USGBC LEED LEED-Green-Associate exam. Online Exam Practice Tests with detailed explanations!


USGBC LEED-Green-Associate Exam Syllabus Topics:

TopicDetails
Topic 1
  • Location and Transportation: This section of the exam measures the skills of urban planners and covers site selection criteria and alternative transportation strategies. It emphasizes choosing sites that minimize environmental impact and promote sustainable transportation options.
Topic 2
  • Energy and Atmosphere: This section of the exam measures the skills of energy efficiency engineers and covers building loads, energy efficiency measures, and alternative energy practices. It emphasizes commissioning, energy auditing, and the use of renewable energy sources.
Topic 3
  • Water Efficiency: This section of the exam measures the skills of water conservation specialists and covers strategies for reducing water usage both indoors and outdoors. It includes the use of gray water and rainwater in irrigation and the implementation of low-flow fixtures.
Topic 4
  • Indoor Environmental Quality: This section of the exam measures the skills of indoor air quality specialists and covers strategies for improving indoor air quality, lighting, acoustics, and occupant comfort. It emphasizes the use of low-emitting materials and green cleaning practices.
Topic 5
  • Sustainable Sites: This section of the exam measures the skills of landscape architects and focuses on on-site assessment and design strategies that reduce environmental impact. It includes topics like habitat conservation, rainwater management, and exterior lighting.
Topic 6
  • Integrative Strategies: This section of the exam measures the skills of project managers and focuses on the integrative process in LEED projects. It includes understanding the roles of various team members and standards that support LEED, such as ASHRAE and ENERGY STAR guidelines. This section highlights the importance of collaboration and systems thinking in achieving sustainable design.

 

NEW QUESTION # 143
A project team is pursuing LEED certification for an existing commercial office building to certify ongoing sustainability performance. Which LEED rating system should be used for this project?

  • A. LEED for Building Operations and Maintenance
  • B. LEED for Building Design and Construction
  • C. LEED for Neighborhood Development
  • D. LEED for Interior Design and Construction

Answer: A

Explanation:
Explanation
LEED for Building Operations and Maintenance (O+M) is the rating system that applies to existing buildings and interior spaces that have been fully operational and occupied for at least one year1. It focuses on performance-oriented sustainable strategies and outcomes, such as energy efficiency, water conservation, waste management, indoor environmental quality, and transportation2. LEED O+M can help existing buildings reduce their environmental impacts and improve their operations1.
References: 2 LEED rating system | U.S. Green Building Council1 LEED for Existing Buildings (LEED-EB) | Harvard Energy & Facilities.


NEW QUESTION # 144
In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?

  • A. Landscaping plant selection
  • B. Irrigation piping systems
  • C. Irrigation control systems
  • D. Rainwater storage cisterns

Answer: D

Explanation:
Explanation
Rainwater storage cisterns are components of a collected rainwater irrigation system that are most likely to make it cost prohibitive over a conventional system in a large site that has a short, intense rainy season and a long, dry season. A collected rainwater irrigation system is a system that collects, stores, and distributes rainwater for irrigation purposes. Rainwater storage cisterns are containers that store the collected rainwater until it is needed for irrigation. In a large site that has a short, intense rainy season and a long, dry season, the rainwater storage cisterns would need to be very large and durable to capture and store enough rainwater for the dry season. This would increase the initial cost and maintenance cost of the system compared to a conventional system that uses potable water or groundwater for irrigation1 . References: LEED v4 Green Associate Candidate Handbook1, EPA's Rainwater Harvesting


NEW QUESTION # 145
Life-cycle cost analysts of a new construction includes consideration of

  • A. cost of subsidizing the use of public transportation
  • B. cost of challenging a real estate tax assessment
  • C. cost of adding accessible parking
  • D. cost of purchasing window glazing

Answer: D

Explanation:
Life-cycle cost analysis (LCCA) is a method for assessing the total cost of owning a facility or running a project. It considers all the costs associated with obtaining, owning, and disposing of an investment1. The cost of purchasing window glazing is one of the initial costs that affects the energy performance and thermal comfort of a building2. Therefore, it is included in the LCCA of a new construction.
https://www.usgbc.org/credentials/leed-green-associate


NEW QUESTION # 146
Which of the following strategies would effectively contribute to reducing potable water consumption used in the process systems of a commercial building while maintaining efficient operation?

  • A. Replacing all kitchen spray valves with low-flow fixtures
  • B. Installing a submeter to track the building's total consumption
  • C. Increasing the cycles of concentration in the cooling tower system
  • D. Increasing once-through cooling for equipment

Answer: C

Explanation:
Increasing the cycles of concentration in a cooling tower system is the best answer because cooling towers are a major source of process water use in many commercial buildings. Higher cycles of concentration mean water is reused more times before blowdown is required, reducing makeup water demand while maintaining efficient operation when water quality is properly managed. Submetering helps track consumption and identify problems, but measurement alone does not reduce water use.
Low-flow kitchen spray valves reduce water use in kitchen operations, but the question focuses on process systems, especially building systems such as cooling towers. Increasing once-through cooling is incorrect because it wastes large amounts of potable water and is discouraged in sustainable water design. Cooling tower water management is a key Water Efficiency strategy.


NEW QUESTION # 147
Which type of site Is appropriate for development of LEED projects?

  • A. Undeveloped
  • B. Brownfield
  • C. Floodplain
  • D. Greenfield

Answer: B

Explanation:
A brownfield site is appropriate for development of LEED projects because it is a site that has been previously used for industrial or commercial purposes and may be contaminated by pollutants or hazardous substances. Developing a brownfield site can help reduce environmental impacts, such as soil erosion, habitat loss, and water consumption, by reusing existing infrastructure and restoring degraded land. LEED projects can earn credits for developing on brownfield sites under the Sustainable Sites category. Reference: LEED v4 BD+C Reference Guide, Sustainable Sites, page 35; Best Management Practice #14: Alternative Water Sources1


NEW QUESTION # 148
A project has 16 employees working for four hours per day, 20 employees working six hours per day, and 10 employees working eight hours per day. What is the Full Time Equivalent (FTE) occupancy of the project?

  • A. 33
  • B. 0
  • C. 1
  • D. 2

Answer: C


NEW QUESTION # 149
Which action promotes pedestrian access to a project site?

  • A. Designating parking spaces closest to the building for exclusive use by carpooling vehicles
  • B. Placing a low speed limit in the parking lot around the building
  • C. Providing shuttle access between the project site and a local transit center
  • D. Utilizing an existing community nature path connecting the building to surrounding buildings

Answer: D

Explanation:
Explanation
Utilizing an existing community nature path connecting the building to surrounding buildings is an action that promotes pedestrian access to a project site. Pedestrian access is the ability of people to walk to and from a project site safely and comfortably. A community nature path is a type of pedestrian infrastructure that provides a pleasant and scenic route for walking, as well as environmental benefits such as habitat creation, stormwater management, and heat island reduction. The other options are not actions that promote pedestrian access to a project site. Placing a low speed limit in the parking lot around the building is an action that enhances pedestrian safety within the project site, but does not improve pedestrian access to the project site.
Providing shuttle access between the project site and a local transit center is an action that encourages alternative transportation, but does not promote pedestrian access to the project site. Designating parking spaces closest to the building for exclusive use by carpooling vehicles is an action that reduces vehicle trips and emissions, but does not promote pedestrian access to the project site. References: LEED Green Associate Candidate Handbook, page 30; USGBC, [Location & Transportation], page 3.


NEW QUESTION # 150
Which of the following standards addresses guidance for sustainable construction in complying with building codes?

  • A. ASHRAE 90.1
  • B. ASHRAE 189.1
  • C. ASHRAE 62.1
  • D. ASHRAE 72

Answer: B

Explanation:
ASHRAE 189.1 is a standard that provides guidance for the design, construction, and operation of high-performance green buildings that comply with building codes and voluntary rating systems. The standard covers topics such as site sustainability, water efficiency, energy efficiency, indoor environmental quality, and the impact of materials and resources12. Reference: LEED v4 Green Associate Candidate Handbook1, ASHRAE's Standard 189.12


NEW QUESTION # 151
Which of the following is the reason Regional Priority credits are awarded?

  • A. To encourage exemplary performance
  • B. To help meet economic goals
  • C. To address local environmental issues
  • D. To promote innovation in building design

Answer: C

Explanation:
Regional Priority credits are awarded to encourage projects to address local environmental issues that are of particular importance or concern for the region where the project is located. These issues may include water scarcity, air quality, habitat protection, or human health. Regional Priority credits are not new LEED credits, but rather existing credits that have been identified by regional councils or chapters of USGBC as having higher priority or relevance for their areas. Projects can earn up to four bonus points by achieving Regional Priority credits. References: LEED v4 BD+C Reference Guide, Introduction, page 13; LEED v4 Impact Category and Point Allocation Process Overview1


NEW QUESTION # 152
A company is considering investing in green power for its operations facilities, but is reluctant because of the high capital investment, maintenance costs and slow initial financial returns. Which of the following is a practical strategy to help the company overcome these obstacles?

  • A. Divert the company's research and development funds to investment in large scale hydroelectric power
  • B. Host an on-site renewable energy generation system and agree to buy the power without owning the equipment
  • C. Hire employees to staff a new operations department in preparation for the maintenance needs of the new renewable energy equipment
  • D. Relocate the company to a region that is better suited for harnessing renewable energy

Answer: B

Explanation:
Explanation
A charrette is an intensive, multi-disciplinary workshop with the aim of developing a design or vision for a project or planning activity. Charrettes are often conducted to design such things as parks and buildings, or to plan communities or transportation systems. A charrette should take place at the beginning of the project, when the design team can engage with all the stakeholders, including the client, users, consultants, contractors, regulators, and community members. A charrette at this stage can help to:
* Establish clear goals and objectives for the project
* Identify opportunities and constraints for the site and program
* Generate creative and innovative ideas and solutions
* Foster collaboration and consensus among diverse perspectives
* Reduce conflicts and delays during later phases of the project
* Enhance communication and trust among the project team
The other options are not appropriate phases for a charrette. Post commissioning is too late to influence the design or planning of the project. During the design process, somedecisions may have already been made or some stakeholders may have been excluded. During the construction process, changes may be costly or impractical to implement. References: : Charrette


NEW QUESTION # 153
The protection and restoration of natural vegetation, wetland areas and bodies of water through building footprint consolidation helps to

  • A. preserve open space and sensitive areas
  • B. minimize hardscape
  • C. prevent light pollution
  • D. support conservation programs

Answer: A

Explanation:
The protection and restoration of natural vegetation, wetland areas and bodies of water through building footprint consolidation helps to preserve open space and sensitive areas, which are important for maintaining biodiversity, ecosystem services, and human well-being. Building footprint consolidation refers to the strategy of minimizing the area of land that is occupied by a building and its associated infrastructure, such as roads, parking lots, and utilities. By reducing the building footprint, project teams can avoid or minimize the impacts of development on natural habitats, wetlands, and water bodies, which often provide critical functions such as water quality improvement, flood control, wildlife habitat, and recreation. LEED v4.1 recognizes and rewards this strategy in the Sensitive Land Protection credit1, which aims to conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity2. Reference: LEED Link: Sensitive Land Protection, section "LEED v4.1 BD+C: Sensitive Land Protection"; Sensitive Land Protection | U.S. Green Building Council, section "Intent"


NEW QUESTION # 154
Which of the following Is the recommended tool for the project team to utilize In order to determine the target certification level?

  • A. Project CIR
  • B. It is not possible to estimate certification level without complete drawings
  • C. Scorecard
  • D. Credit Submittal Form

Answer: C

Explanation:
Explanation
The scorecard is the recommended tool for the project team to utilize in order to determine the target certification level. The scorecard is a document that lists all the prerequisites and credits available for a specific rating system, along with their point values and requirements. The project team can use the scorecard to track their progress and estimate their potential score based on their design strategies and performance goals. The scorecard also helps the project team to identify synergies and trade-offs among different credits, prioritize their efforts, and optimize their resources.
The other options are not useful for estimating the certification level, as they are tools for documenting or clarifying specific credits or issues. The credit submittal form is a template that guides the project team on how to submit the required documentation for each credit. The project CIR (Credit Interpretation Request) is a service that allows the project team to ask technical questions or request clarifications on credit requirements or standards from USGBC or GBCI reviewers. The certification level cannot be determined without complete drawings, as they are necessary to demonstrate compliance with credit criteria.
References: LEED v4 User Guide, p. 12 2; LEED v4 Reference Guide for Building Design and Construction, p. 21 1


NEW QUESTION # 155
Energy and Atmosphere Credit encompasses

  • A. building loads, energy performance management and EQ
  • B. building loads, energy performance management and environmental concerns
  • C. site selection, site design and environmental concerns
  • D. integrative process, building loads and EQ

Answer: A

Explanation:
Explanation
The Energy and Atmosphere Credit in LEED encompasses building loads, energy performance management, and environmental quality (EQ). Building loads refer to the amount of energy consumed by a building's systems, such as heating, cooling, lighting, and equipment. Energy performance management involves strategies to reduce energy consumption and improve efficiency. Environmental quality refers to the conditions inside the building, including air quality, thermal comfort, and access to daylight and views. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 156
Which of the following concepts uses drought-tolerant native and adaptive plants to promote water conservation?

  • A. Bioswales
  • B. Monoculture
  • C. Xeriscaplng
  • D. Weather-based irrigation

Answer: C

Explanation:
Explanation
Xeriscaping is a landscaping practice that uses drought-tolerant native and adaptive plants to reduce water use and maintenance. Xeriscaping also incorporates other strategies such as mulching, efficient irrigation, soil improvement, and appropriate design and zoning. By using xeriscaping, projects can conserve water, protect natural habitats, reduce stormwater runoff and pollution, and enhance the aesthetic and ecological value of the site. References: LEED v4 Reference Guide for Building Design and Construction, p. 123 1; [Xeriscape Colorado website]


NEW QUESTION # 157
Which of the following is an appropriate way to use non-potable water in a building?

  • A. Using wastewater from a sink for dishwashing
  • B. Using captured stormwater for showering
  • C. Incorporating air conditioner process water for washing clothes
  • D. Flushing a toilet with wastewater from bathroom sinks

Answer: D

Explanation:
Non-potable water is water that is not suitable for human consumption, but can be used for other purposes that do not require potable quality water. Non-potable water sources include rainwater, reclaimed/recycled water and greywater. Greywater is wastewater from sinks, showers, bathtubs, washing machines and dishwashers that can be reused for applications such as toilet flushing, irrigation and cooling tower make-up water12. Using non-potable water can reduce the demand for potable water and contribute to LEED water efficiency credits34.
References :=
* SRI Calculator | LEEDuser
* What Is Solar Reflectance Index (SRI) of Materials?
* Water Efficiency and LEED Certification | Contractor
* Water Balance Analysis - ASHRAE
* What is LEED? | Net Zero Water Inc. - Net Zero Water


NEW QUESTION # 158
Aside from retaining the existing structure, what is the next most effective strategy for reducing waste?

  • A. Reusing building components
  • B. Composting organics
  • C. Designing for disassembly
  • D. Recycling materials

Answer: A

Explanation:
Reusing building components is the best answer because reuse generally ranks higher than recycling in the waste management hierarchy. Retaining an existing structure avoids the largest amount of demolition waste and reduces the need for new materials. After that, salvaging and reusing building components such as doors, flooring, casework, fixtures, brick, or structural elements preserves embodied energy and avoids disposal. Recycling is beneficial, but it usually requires processing, transportation, and remanufacturing. Composting organics is useful for organic waste but is not the next most effective building-material strategy. Designing for disassembly is valuable for future reuse, but it does not necessarily reduce immediate project waste as directly as reusing components. LEED Materials and Resources emphasizes reducing waste at the source before recycling.


NEW QUESTION # 159
......

Get instant access to LEED-Green-Associate practice exam questions: https://drive.google.com/open?id=14Akk9fMuqzGWj1GucxLJIxOd0qa538WS

The best LEED-Green-Associate exam study material and preparation tool is here: https://www.newpassleader.com/USGBC/LEED-Green-Associate-exam-preparation-materials.html