Latest [Jun 18, 2024] 100% Passing Guarantee - Brilliant E-S4HCON2023 Exam Questions PDF [Q20-Q40]

Share

Latest [Jun 18, 2024] 100% Passing Guarantee - Brilliant E-S4HCON2023 Exam Questions PDF

E-S4HCON2023 Certification – Valid Exam Dumps Questions Study Guide! (Updated 81 Questions)

NEW QUESTION # 20
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?

  • A. Table count verification
  • B. Migration repetition option
  • C. Table contents compare
  • D. DMO with system move

Answer: D


NEW QUESTION # 21
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. An additional temporary database is used during uptime
  • B. Dedicated application tables are migrated in uptime
  • C. The repository is migrated in uptime
  • D. TABIMJJPG is executed in uptime

Answer: B


NEW QUESTION # 22
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Near-Zero Downtime Technology (NZDT)
  • B. Near-Zero Downtime Maintenance (nZDM)
  • C. Downtime Optimized DMO (DoDMO)
  • D. Downtime Optimized Data Conversion (DoC)

Answer: A


NEW QUESTION # 23
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. As part of the cleanup process
  • B. At the end of the downtime
  • C. Early in the downtime
  • D. Before the downtime starts

Answer: D


NEW QUESTION # 24
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • B. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • C. SAP S/4HANA conversion including database migration and Unicode conversion
  • D. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • E. Unicode conversion SAP S/4HANA conversion including database migration

Answer: B,D,E


NEW QUESTION # 25
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above?
There are 3 correct answers to this question.

  • A. Homogenous system copy
  • B. Database migration
  • C. Support Package Stack update
  • D. Dual Stack split
  • E. Release upgrade

Answer: B,C,E


NEW QUESTION # 26
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. Before continuing with the next phase SUM asks for a modification adjustment transport
  • B. SUM continues with the next phase and your modifications are lost
  • C. SUM continues with the next phase and your modifications are kept as In the start release
  • D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport

Answer: C


NEW QUESTION # 27
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. An SAP S4HANA 1709 sandbox system
  • B. AA
  • C. A Standalone SAP system with ABAP 7.51 or above

Answer: A,C


NEW QUESTION # 28
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for source release, Windows, SAP MaxDB
  • B. Kernel for target release, Windows, SAP HANA
  • C. Kernel for target release, Linux, SAP HANA
  • D. Kernel for target release, Windows, SAP MaxDB

Answer: A,B


NEW QUESTION # 29
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the activation
  • B. To optimize the conversion
  • C. To optimize the migration
  • D. To optimize the main import

Answer: C


NEW QUESTION # 30
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
  • B. Check the dump size of the database export on disk.
  • C. Check the Charts Control Center in the SUM Ul
  • D. Check the log files written in the SUM directory subdirectory abap. subdirectory log

Answer: B,D


NEW QUESTION # 31
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains the database migration option (DMO) of SUM.
  • B. It is a database-specific document.
  • C. It contains a section about the simplification item (SI) checks.
  • D. It explains where to find information about the custom code analysis.

Answer: C,D


NEW QUESTION # 32
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • B. The upgrade of the PRD must be finished before you start new development in the DEV.
  • C. The transport between Unicode and non-Unicode systems is forbidden.
  • D. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.

Answer: D


NEW QUESTION # 33
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Using DMO when applying Support Packages to SAP ECC 6.07
  • B. Updating to SAP ECC 6.07 using DMO
  • C. Upgrading to SAP ECC 6.08 without using DMO
  • D. SAP S/4HANA conversion to SAP S/4HANA 1709

Answer: C,D


NEW QUESTION # 34
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

  • A. The SAP S/4HANA Conversion includes a DMO.
  • B. The start release is too old for DOC.
  • C. The SAP S/4HANA Conversion is without DMO.
  • D. The source database is not supported

Answer: D


NEW QUESTION # 35
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In Process Control Center
  • B. In SUM Phaselist
  • C. In SUM Parameters
  • D. In DMO Migration Preparation

Answer: A,C


NEW QUESTION # 36
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B


NEW QUESTION # 37
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages that will be bound to the conversion
  • B. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
  • C. The SAP support packages of the support package stack, calculated by the maintenance planner
  • D. The SAP support packages in the download directory that are newer than the selected support package stack

Answer: D


NEW QUESTION # 38
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support Packages found in the download directory

Answer: D


NEW QUESTION # 39
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

Answer: A


NEW QUESTION # 40
......

E-S4HCON2023 are Available for Instant Access: https://www.newpassleader.com/SAP/E-S4HCON2023-exam-preparation-materials.html

E-S4HCON2023 Dumps 2024 - New SAP E-S4HCON2023 Exam Questions: https://drive.google.com/open?id=16etTqDbDB82RJsnukzYLDXatED5RKcre