NEW QUESTION 12
Which material type is the best choice if you only want to create a structure element within the BOM?

  • A. Manufacturer Part (HERS)
  • B. Compatible Unit (CBAU)
  • C. Maintenance Assembly (IBAU)
  • D. Spare Part (ERSA)

Answer: C

 

NEW QUESTION 13
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct Answers to this question.

  • A. Start date
  • B. Factory calendar
  • C. Scheduling indicator
  • D. Scheduling period

Answer: A,D

 

NEW QUESTION 14
Which of the following statements about breakdown maintenance are correct? Note: There are 3 correct Answers to this question.

  • A. Orders and notifications can be used in combination.
  • B. Orders always need to be combined with notifications.
  • C. Maintenance orders can be created as immediate orders without any planning.
  • D. More than one operation must always be maintained in the maintenance order.
  • E. Notifications are used for documentation of technical findings and activities performed.

Answer: A,C,E

 

NEW QUESTION 15
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?

  • A. Offset
  • B. Scheduling indicator
  • C. Scheduling period
  • D. Call horizon

Answer: C

 

NEW QUESTION 16
Which of the following parameters are available when you define a new maintenance plan category?
Note: There are 3 correct Answers to this question.

  • A. Maintenance activity type
  • B. Change documents
  • C. Order type
  • D. Call object
  • E. Completion date

Answer: B,D,E

 

NEW QUESTION 17
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct Answers to this question.

  • A. Fixed price of the activity type
  • B. Organizational unit (HR)
  • C. Capacity category
  • D. Calculation key

Answer: B,C

 

NEW QUESTION 18
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note:
There are 3 correct Answers to this question.

  • A. View details of the technical object by navigating to the Asset Viewer.
  • B. Select and print the maintenance order shop papers.
  • C. Input estimated costs for repair malfunction.
  • D. Display the current location of the technical object.
  • E. Add a URL to provide further information.

Answer: A,D,E

 

NEW QUESTION 19
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct Answers to this question.

  • A. When an order is created based on a single notification, this notification becomes the header notification.
  • B. The document within the document management system can be assigned only at operational level.
  • C. The assignment of the header notification to an order CANNOT be deleted.
  • D. The long text of the reference notification can be automatically copied as the long text of the order.

Answer: A,D

 

NEW QUESTION 20
Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct Answers to this question.

  • A. The cloud version can also use SAP GUI for Windows.
  • B. Web Dynpro apps can be used in the SAP Fiori launchpad.
  • C. SAP GUI transactions can be used in the SAP Fiori launchpad.
  • D. SAP Fiori launchpad supports only SAPUI5 apps.

Answer: B,D

 

NEW QUESTION 21
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note:
There are 2 correct Answers to this question.

  • A. Counter overflow reading
  • B. Start counter reading
  • C. Estimated annual performance
  • D. Scheduling period

Answer: B,C

 

NEW QUESTION 22
You create a revision for a Maintenance Event Builder (MEB) scenario. Which of the following statements are correct? Note: There are 2 correct Answers to this question.

  • A. You must assign maintenance notifications to the revision.
  • B. You can assign a hierarchical task list to the revision.
  • C. You can assign a network to a revision.
  • D. You must use hierarchical task lists for the MEB scenario.

Answer: A,B

 

NEW QUESTION 23
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct Answers to this question.

  • A. Open purchase orders are recompiled.
  • B. Open reservations are recompiled.
  • C. Open purchase requisitions are recompiled.
  • D. Referenced notifications are put In Process again.

Answer: B,C

 

NEW QUESTION 24
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct Answers to this question.

  • A. Warranty
  • B. Configuration
  • C. Serial data
  • D. Manufacturer data

Answer: B,C

 

NEW QUESTION 25
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct Answers to this question.

  • A. Assign a serial number profile to the equipment category.
  • B. Maintain a serial number for an existing equipment master.
  • C. Add a serialized material to the construction type field of the equipment master.
  • D. Assign a serial number profile to the related material master.
  • E. Add a serialized material to the equipment serial data view.

Answer: C,D,E

 

NEW QUESTION 26
What is the correct receiver object type for the settlement of a refurbishment order?

  • A. The WBS element
  • B. The cost center
  • C. The material
  • D. The fixed asset

Answer: C

 

NEW QUESTION 27
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.

  • A. The settlement rule is maintained on the header level.
  • B. A technical object must be assigned to an order operation.
  • C. Costs are stored only for the operation object.
  • D. Overall costs are dynamically summed up on the header level.
  • E. Purchase requisitions have the operation as account assignment.

Answer: B,C,D

 

NEW QUESTION 28
......

C-TS413-2020 exam questions from NewPassLeader dumps: https://www.newpassleader.com/SAP/C-TS413-2020-exam-preparation-materials.html (82  Q&As)