
1Z0-996-21 Practice Dumps - Verified By NewPassLeader Updated 72 Questions
Updated 1Z0-996-21 Exam Dumps - PDF Questions and Testing Engine
Oracle 1Z0-996-21 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
NEW QUESTION 14
Which two statements about usage subscription types are correct? (Choose two.)
- A. Usage subscription types define the recipient of the usage.
- B. Usage subscription types define the valid service point types.
- C. Usage subscription types define the main billing contact.
- D. Usage subscription types define the time zone.
Answer: B,D
NEW QUESTION 15
When a customer has a specific price for a defined quantity which is different to other customers, where is this specific price for the related Bill Factor defined?
- A. Service Agreement - Contract Value
- B. Calculation Rule
- C. Bill Factor Value
- D. Account Characteristic
- E. Bill Factor Characteristic
Answer: A
NEW QUESTION 16
Which three statements are correct for Adjustment Types? (Choose three.)
- A. They control whether a rate is to be called to calculate an adjustment amount.
- B. They control the valid Service Agreement Types that adjustments can be linked to.
- C. They control how adjustments appear on bills.
- D. They can default an Adjustment Amount to adjustments.
- E. They control the valid Adjustment Profiles that adjustment types can belong to.
Answer: A,B,C
NEW QUESTION 17
Within the application, operational devices can be assets or components.
Which two statements are true about components? (Choose two.)
- A. Components are not a class of assets.
- B. Components can be installed at locations.
- C. Components have a disposition that tracks their location and status.
- D. Components are attached to assets.
- E. Components can't have specifications.
Answer: B,D
NEW QUESTION 18
Which three statements are true about initial measurements, final measurements, and usage? (Choose three.)
- A. A service point can have more than one initial measurement for the same period, but only one final measurement.
- B. The initial measurement data can be optionally stored in Raw format.
- C. Usage is loaded in the application to generate final measurements.
- D. Usage is a synonym for bill determinants.
- E. Final measurements can be directly edited or updated by users or by automated processes as required.
Answer: A,C,E
NEW QUESTION 19
Approval Profiles control which aspects of an Adjustment?
- A. whether current and/or payoff balance are affected by the adjustment
- B. information defaulted on an Adjustment
- C. if an adjustment requires approval before it's frozen
- D. whether the adjustment should appear on the customer's next bill
- E. control how adjustments are approved
Answer: A
Explanation:
Reference:
%20Adjustment%20Approval.pdf
NEW QUESTION 20
Your client has three requirements:
1. Apply validations on meter reads coming from the Data Collectors.
2. If a meter read does not pass the validation, an error will be generated and assigned to a user.
3. Retry the validation every 30 minutes for the errors in case the issue is related to configuration.
Which statement describes the base functions you should use?
- A. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-COMP-TD (Complete To Do Entries).
- B. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be manually loaded.
- C. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-CRE-IMDTD (Create To Do)
- D. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be loaded after 30 minutes.
- E. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-IMD-RETRY (Retry Initial Measurement Data Processing)
Answer: C
NEW QUESTION 21
The base package usage transaction business object is represented by D2-UsageTransaction. The usage calculation engine or process drives the specifics of the usage to be calculated on this business object.
Based on this, which three configuration areas will have an impact on the usage calculation process? (Choose three.)
- A. TOU map
- B. Usage Rule
- C. VEE rule
- D. Factor Override
Answer: A,B,D
NEW QUESTION 22
Which configuration steps are required to derive loss-adjusted kWh on a measuring component based on a loss factor value related to a service point?
- A. Configure a Service Point Characteristic Type, factor, derivation algorithm, and Service Quantity Identifier (SQI), and then associate the SQI and derivation algorithm to the Measuring Component Type and the characteristic value to the service point.
- B. Configure a Service Point Characteristic Type and derivation algorithm, and then associate the algorithm to the Measuring Component Type and the characteristic value to the service point.
- C. Configure a factor and derivation algorithm, and then associate the factor to the Measuring Component Type and the derivation algorithm to the service point.
- D. Configure a factor and derivation algorithm, and then associate both to the Measuring Component Type and service point.
- E. Configure an SQI and the derivation algorithm, and then associate the algorithm to the Measuring Component Type and SQI to the service point.
Answer: E
NEW QUESTION 23
Which usage rule would be used to retrieve scalar measurements and convert the total from one unit of measure to another?
- A. Get Scalar Details and Apply Formula
- B. Get Scalar Details and Axis Conversion
- C. A custom set of usage rules must be written.
- D. Get Scalar Details and Math
Answer: B
NEW QUESTION 24
What contains the details of how a bill was calculated and how it will be printed on a bill?
- A. Bill
- B. Service Agreement
- C. Rate Schedule
- D. Bill Segments
- E. Calculation Rules
Answer: D
NEW QUESTION 25
A usage subscription must exist before usage transactions can be calculated for a specific service point.
Where do you configure the usage recipient?
- A. in the Usage Subscription Type
- B. in the Usage Rule Type
- C. in the Service Point Type
- D. in the Measuring Component Type
- E. in the Device Type
Answer: A
NEW QUESTION 26
What correctly describes the possible causes of price proration?
- A. change in Rate Schedule only
- B. change in Bill Factor only
- C. changes in Rate Version Calculation Group and Bill Factor only
- D. changes in Rate Schedule and Bill Factor only
- E. change in Rate Version Calculation Group only
Answer: D
NEW QUESTION 27
Which three statements are true in relation to a Payment Arrangement Request? (Choose three.)
- A. creates the Payment Arrangement Service Agreement
- B. examines the Account's eligibility for Payment Arrangement
- C. calculates delinquent amount for Service Agreements eligible for Payment Arrangement
- D. determines if the Payment Arrangement Request requires approval
- E. ensures creation of either Pay Plan or Payment Arrangement
Answer: A,B,D
NEW QUESTION 28
How do you ensure that specific Validation, Editing, and Estimation (VEE) rules are applied to estimated measurements?
- A. by adding the VEE Group to the Device Type
- B. by adding the estimation rules to the Manual Override VEE Group to the Measuring Component Type
- C. by adding the VEE Group as the Fallback VEE Group for the appropriate VEE role
- D. by adding the VEE Group to the Device Configuration Type
Answer: B
NEW QUESTION 29
Which three are important Account concepts that must always be followed? (Choose three.)
- A. An Account references one or more persons.
- B. Accounts expire when there are no active contracts.
- C. Every Account has a unique, system-assigned Account ID.
- D. Bills are produced for an account and are sent to the account persons.
- E. An Account can only reference one and only one person at one time.
Answer: C,D,E
NEW QUESTION 30
For a customer to receive a Subscription communication, what must they have?
- A. an active address contact preference
- B. an active account contact preference
- C. an active person contact preference
- D. an active address type preference
Answer: B
NEW QUESTION 31
When configuring the Get Scalar Details usage rule, which three attributes can be defined to retrieve scalar values? (Choose three.)
- A. Unit of Measure
- B. Time of Use
- C. Device ID
- D. Service Point ID
- E. Service Quantity Identifier
Answer: B,C,D
NEW QUESTION 32
If a customer makes a payment for more than what is due for the account, which entity contains the logic for how this overpayment should be handled?
- A. Tender Type
- B. Pay Segment Type
- C. Customer Class
- D. Installation Options
- E. Service Agreement Type
Answer: C,D,E
NEW QUESTION 33
When a service agreement is created, it is based on a template called the Service Agreement Type (SA Type) and values may be defaulted from a Start Option.
Which three attributes can get defaulted from a Start Option? (Choose three.)
- A. Service to be billed
- B. CIS Division
- C. Rate
- D. Terms and Conditions
- E. Contract Quantities
Answer: A,D,E
NEW QUESTION 34
There has been a meter exchange at a service point in the past year.
How many installation events exist for the service point for the past year?
- A. Two
- B. None
- C. One
- D. Three
- E. Four
Answer: C
NEW QUESTION 35
A Service Order Orchestrator determines the steps required to complete the service.
As an example, based on the state of the service point, what does the Enable Service Orchestrator determine the actions for?
- A. Connect the Service Point; Install a Device; Create a Usage Subscription
- B. Create a Device Configuration; Install a Device; Turn on the Device
- C. Create a Service Point; Install a Device; Turn on the Device
- D. Connect the Service Point; Install a Device; Turn on the Device
Answer: C
NEW QUESTION 36
Your client has the following requirements:
Many customers are installing their own solar electrical generation equipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.
In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid. Both reads will be stored in kWh, but the import is subtractive and export is consumptive.
What solution should you choose to configure the measuring component types for these specific requirements?
- A. Create two service points: one for subtractive import and the other for consumptive export.
- B. Create two new measuring component types (one for subtractive import and the other for consumptive export) to enable the creation of two measuring components that will be linked to one scalar device.
- C. Create one new measuring component type for creating a new measuring component that will be linked to two different scalar devices (one for import and the other for export).
- D. Create one new measuring component type for creating two measuring components (one for import and the other for export) that will be linked to one scalar device.
Answer: B
NEW QUESTION 37
Which statement correctly describes the relation between a device and a measuring component?
- A. A device should have only one measuring component type.
- B. Two measuring components on the same device should have the same Units of Measure (UOM).
- C. A device configuration links a device only to interval channels.
- D. A device can have any combination of interval and/or scalar measuring components.
Answer: D
NEW QUESTION 38
You are configuring a VEE group to include rules to be executed when loading the initial measurement data (IMD).
What is the VEE group directly associated with?
- A. Device Type and Measuring Component Type
- B. Device Configuration Type
- C. Measuring Component Type
- D. Device Type
- E. Usage Type
Answer: B
NEW QUESTION 39
......
New (2022) Oracle 1Z0-996-21 Exam Dumps: https://www.newpassleader.com/Oracle/1Z0-996-21-exam-preparation-materials.html